Skip to content
Charging location

Sitronic Отель Изумрудный Лес

OCM-257235 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

46К-0250
Московская область
Russian Federation

Summary

Number Of Stations/Bays
1
Usage
Public
Usage Cost
14-17
Operational Status
Operational
Latitude
56.128572435089865
Longitude
36.508095319760855
OCM Ref
OCM-257235

Network/Operator

(Unknown Operator)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

1 present
Operational
50 kW
DC

CHAdeMO

1 present
Operational
50 kW
DC

Type 2 (Socket Only)

3 present
Operational
22 kW
400 V
32 A
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 4 matching results

Отель Усадьба Охотника, 1, гор. округ Клин, Москва, Russian Federation
0.75 Miles Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
квартал 0070352, 193, Истра, 000000, Russian Federation
9.91 Miles Public - Membership Required Operational Level 3: High (Over 40kW) GB-T DC - GB/T 20234.3
территория Строй Капитал, 1, Городской округ Истра, Московская область, 143513, Russian Federation
10.89 Miles Public - Pay At Location Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Кафе «Помпончик», деревня Гребеньки, Гребеньки, 000000, Russian Federation
12.06 Miles Public - Membership Required Operational Level 3: High (Over 40kW) GB-T DC - GB/T 20234.3
Upload your own photos for this location Sign In