Skip to content
Charging location

Lidl Mallow

OCM-209925 Not Operational Public - Membership Required
To edit, add comments or upload photos Sign in

Nearest Address

West End
Mallow
P51 P732
Ireland

Summary

Number Of Stations/Bays
2
Usage
Public - Membership Required
Operational Status
Not Operational
Latitude
52.1371383841946
Longitude
-8.652675957653287
OCM Ref
OCM-209925

Network/Operator

EZO (IE)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
80 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

1 present
Operational
50 kW
DC

CHAdeMO

1 present
Operational
50 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Mallow Retail Park, Mallow, Co. Cork, Ireland
0.01 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Annabella, Mallow, Co. Cork, Ireland
0.11 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Springwood, Mallow, County Cork, Ireland
0.17 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Annabella Park, Mallow, Co. Cork, Ireland
0.26 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
R619, Mallow, Co. Cork, Ireland
0.37 Miles Public - Membership Required Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
Thomas Davis St, Mallow, Co. Cork, Ireland
0.39 Miles Public - Membership Required Planned For Future Date
R619, Mallow, Co. Cork, Ireland
0.5 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
N20, Mallow, Co. Cork, Ireland
0.63 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Spa Springs, Mallow, Ireland
0.65 Miles Public - Membership Required Not Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by thommcg on 2025-07-21