Skip to content
Charging location

Ayunt. Guitiriz

OCM-205569 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Praza Campo da Feira
Guitiriz
Galicia
27300
Spain

Summary

Number Of Stations/Bays
2
Usage
Public - Membership Required
Usage Cost
0,32€/kWh
Operational Status
Operational
Latitude
43.18225815603623
Longitude
-7.8948398655659275
OCM Ref
OCM-205569

Network/Operator

(Unknown Operator)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

2 present
Operational
22 kW
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Autovía do Noroeste, Guitiriz, Galicia, 27309, Spain
1.71 Miles Public - Membership Required Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
Autovía do Noroeste, Guitiriz, Galicia, 27309, Spain
1.72 Miles Public - Membership Required Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
LU-170, Guitiriz, Galicia, 27305, Spain
3.35 Miles Public - Membership Required Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
CEPSA, Curtis, Galicia, 27309, Spain
3.69 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Complejo Ruta Esmeralda, Begonte, Galicia, 27389, Spain
6.49 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Teixeiro, Galicia, 15310, Spain
7.69 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Teixeiro, Galicia, 15310, Spain
7.88 Miles Public - Membership Required Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
AC-151, Galicia, 15317, Spain
8.17 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Monfero, Galicia, 15619, Spain
9.68 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In