Centre Commercialecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Freshmile https://www.freshmile.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ Fault Report (Notice To Users And Operator) , Charged Successfully ]les 4 bornes sont des tristandard : T2 en 22kW, CCS en 25kW (et non pas 180 comme indiqué chez vous), et Chademo en 25kW (je suppose)
Comment by Kaxu64 03/30/2025 14:19:06
Other Charging Locations
There are 9 matching results
Avenue François Mitterrand
3
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Rue de Socoa
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SAINT JEAN DE LUZ - Parking Urdazuri
2
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
URRUGNE - Parking D'Abbadie
2
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Coeur de Ville
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SAINT JEAN DE LUZ - Parking Des Pyrénées
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
URRUGNE - Parking Osasuna
3
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hôtel Parc Victoria
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Carrefour Energies - Saint-Jean-de-Luz
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)