EVA Stabroekcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Left on the parking, at the Brantano shop
Blue Corner (Belgium) http://www.bluecorner.be/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CEE 7/4 - Schuko - Type F
Add your own comment/check-in for this location:
Sign InRating: 3 out of 5 [ General Comment , Equipment & Location Confirmed Correct ]1 place iced
Comment by Someone_Just_ 11/03/2018 21:46:23
[ General Comment , Equipment & Location Confirmed Correct ] Comment by Someone_Just_ 10/07/2018 19:18:56
Rating: 3 out of 5 [ General Comment , Charged Successfully ]1 place iced
Comment by Someone_Just_ 04/02/2016 21:06:13
Rating: 5 out of 5 [ General Comment , Charged Successfully ] Comment by Someone_Just_ 10/20/2014 21:07:16
Rating: 5 out of 5 [ General Comment , Charged Successfully ]Working fine with "The New Motion" card
Comment by Someone_Just_ 01/30/2014 22:03:02
Other Charging Locations
There are 9 matching results
Eoluz
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tulpstraat 65
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Basic-Fit 2074 Ekeren (PowerGo)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gemeentelijk sportcentrum Kapellen
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Laadeiland EVA Kapellen
6
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Kapellen
4
3
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Colruyt Ekeren
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking kasteeltje Hof Mertens
4
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Molenweg Brasschaat
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
and 6 for bicycles.
Uploaded by Someone_Just_ on 2013-08-27
2 places for cars (no the CEE connections are not under power...)
Uploaded by Someone_Just_ on 2013-08-27