Skip to content
Charging location

Flint Mountain Supercharger

OCM-175356 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Mountain Park Hotel
Northop Road
Flint Mountain
Wales
CH6 5QG
United Kingdom

Summary

Number Of Stations/Bays
8
Usage
Public
Usage Cost
£0.37/kWh; other tariffs available
Operational Status
Operational
Latitude
53.23214
Longitude
-3.142146
OCM Ref
OCM-175356

Network/Operator

Tesla (including non-tesla)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

8 present
Operational
250 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Allt Goch, Flint, CH6 5AS, United Kingdom
1.07 Miles Public Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Richard Heights, flint, CH6 5AG, United Kingdom
1.25 Miles Public Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Castle Dyke Street, Flint, CH6 5PJ, United Kingdom
1.39 Miles Public Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
A5026 Pistyll Junction To B5123 Underpass, Pentre Halkyn, Wales, CH8 8BD, United Kingdom
2.2 Miles Public - Pay At Location Operational Level 3: High (Over 40kW) CHAdeMO
Milwr, Holywell, CH8 8HE, United Kingdom
3.14 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
New Brighton Road, Mold, CH7 6RG, United Kingdom
3.61 Miles Public - Pay At Location Operational Level 3: High (Over 40kW) CCS (Type 2)
New Brighton, Mold, CH7 6RG, United Kingdom
3.64 Miles Public - Membership Required Level 3: High (Over 40kW) CHAdeMO
Gateway Services, A55, Mold, Wales, CH7 6HB, United Kingdom
3.74 Miles Public - Pay At Location Operational Level 3: High (Over 40kW) CCS (Type 2)
Pen-Y-Maes Road, Holywell, CH8 7HN, United Kingdom
4.28 Miles Public Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In