Skip to content
Charging location

Enel X Città Giardino Mirafiori Nord

OCM-173942 Planned For Future Date Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Corso Gaetano Salvemini 30/A
Torino
TO
Italy

Summary

Number Of Stations/Bays
1
Usage
Public
Operational Status
Planned For Future Date
Latitude
45.045515
Longitude
7.625377
OCM Ref
OCM-173942

Network/Operator

Enel X

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

Status Unknown
50 kW
DC

CHAdeMO

Status Unknown
50 kW
DC

Type 2 (Tethered Connector)

Status Unknown
43 kW
400 V
63 A
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Via Monfalcone 96, Torino, TO, Italy
0.78 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Ada Negri, Santa Rita, Torino, TO, 10136, Italy
0.97 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Crea 10, Grugliasco, TO, Italy
1 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Tripoli, 72, Torino, TO, 10136, Italy
1.07 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Crea 10, Grugliasco, TO, Italy
1.1 Miles Public - Membership Required Operational Level 3: High (Over 40kW) NACS / Tesla Supercharger
Corso Racconigi, 236/a, Torino, TO, 10141 , Italy
1.3 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Corso canonico Giuseppe Allamano, Grugliasco, Piemont, 10095, Italy
1.31 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2021-03-08
Uploaded by ForumElettrico.it on 2021-03-08
Uploaded by ForumElettrico.it on 2021-03-08
Uploaded by ForumElettrico.it on 2021-03-08
Uploaded by ForumElettrico.it on 2021-03-08
Uploaded by ForumElettrico.it on 2021-03-08