Skip to content
Charging location

Petro Canada - Blue River BC Hydro dual-standard fast charger

OCM-133853 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

883 Highway 5 Shell Road
Blue River,
BC
V0E 1J0
Canada

Summary

Number Of Stations/Bays
1
Usage
Public
Usage Cost
0.21
Operational Status
Operational
Latitude
52.1097700264122
Longitude
-119.309733682327
OCM Ref
OCM-133853

General Information

The fast charger can be activated by the BC Hydro EV app, RFID card or by calling BC Hydro at 1 866 338-3369. Flo app/Card and ChargePoint app also supported.

Access Information

BC Hydro dual-standard fast charger (one vehicle at a time) at the back of the Blue River Petro Canada off Highway 5.

Network/Operator

BC Hydro

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
80 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CHAdeMO

1 present
Operational
50 kW
400 V
DC

CCS (Type 1)

1 present
Operational
50 kW
400 V
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 3 matching results

965 S Yellowhead Hwy, Blue River, British Columbia, V0E 1J0, Canada
0.34 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
960 Harwood DR, Blue River, British Columbia, V0E 1J0, Canada
0.47 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
Upload your own photos for this location Sign In

BC Hydro completion

Uploaded by bert hogendoorn on 2019-10-28