Fastned Meedenertolcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
FastNed https://fastnedcharging.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Fastned Roode Til
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gezondheids Centrum Scheemda
1
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LEAP24 Charging Station
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zuidbroek
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Van der Valk Hotel Groningen-Zuidbroek
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Kerkstraat 2
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vincent van Goghlaan 12
Operational
Level 1 : Low (Under 2kW)
Type 2 (Socket Only)
LEAP24 Charging Station
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
De Zwaaikom 20
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In