Skip to content
Charging location

STRUM 50 kW (IQ)

OCM-118572 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Bolsunovska Str. 13-15
Kyiv
Печерский район
01014
Ukraine

Summary

Number Of Stations/Bays
3
Usage
Public - Membership Required
Usage Cost
DC - 9 UAH/kWh (≈0.30 €/kWh), AC - 4.5 UAH/kWh (≈0.15 €/kWh). No fees for time or session.
Operational Status
Operational
Latitude
50.4215702954336
Longitude
30.5532089857808
OCM Ref
OCM-118572

General Information

Registration, top-up & charging via 'STRUM Charging' mobile app (iOS/Android), at least 25.00 kWh must be available on the account at the start of each charging session. Additional cost of parking - from 07:00 to 23:00 is 20 UAH / 30 minutes, at night from 23:00 to 07:00 is 16 UAH / 30 minutes, leaving in first 14 minutes is free. Parking is free for 1 hour with STRUM card. You can book your STRUM card only after registrartion & top-up by sending request to support.strum@dtek.com. You pay only for kWh, no fees for time or session. Price during top-up is 9 UAH/KWH (≈ 0.3 €/KWH). While charging on CHAdeMO/CCS, 1 KWH is taken away for each 1 kWh of charging. While charging on Type2, 0.5 KWH is taken away for each 1 kWh of charging (half price). Actual prices at http://strum.dtek.com/en/prices/. Android App download - https://play.google.com/store/apps/details?id=com.beenergised.chargemobile.dtek&hl=en iOS App download - https://itunes.apple.com/us/app/strum-charging/id1368596475?mt=8

Access Information

24h access. Entrance is on the left side of the building. Charger is on first floor, move clockwise to parking lots № 3-4. Additional cost of parking - from 07:00 to 23:00 is 20 UAH / 30 minutes, at night from 23:00 to 07:00 is 16 UAH / 30 minutes, leaving in first 14 minutes is free. Parking is free for 1 hour with STRUM card. You can book your STRUM card only after registrartion & top-up by sending request to support.strum@dtek.com. Payment is on exit from parking.

Network/Operator

YASNO E-mobility

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
80 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CHAdeMO

1 present
Operational
50 kW
400 V
125 A
DC

CCS (Type 2)

1 present
Operational
50 kW
400 V
125 A
DC

Type 2 (Socket Only)

1 present
Operational
22 kW
400 V
32 A
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

7 Akademika Filatova Street, Kyiv, 01042, Ukraine
0.99 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
вул. Іоанна Павла ІІ, 5, м. Київ, Ukraine
1 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
вулиця Іоана Павла II, 5, Kyiv, 03150, Ukraine
1 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
вул. Іоанна Павла ІІ, 5, Київ, 03150, Ukraine
1 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
35D, Predslavynska, Kyiv, 03150, Ukraine, Kyiv, Ukraine
1.29 Miles Public Operational
Antonovich street 176, Kyiv, Kyiv, 03048, Ukraine
1.55 Miles Public Operational Level 2 : Medium (Over 2kW) CEE 7/5
Спортивна площа, 1, Kyiv, 01023, Ukraine
1.74 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In
Uploaded by STRUM Charging on 2019-03-25
Uploaded by STRUM Charging on 2019-03-25
Uploaded by STRUM Charging on 2019-03-25
Uploaded by STRUM Charging on 2019-03-25