Elektro Ljubljanacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Gremo na elektriko (SI) https://www.gremonaelektriko.si/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]Charged using Grema Na Elektriko app: 0.22€/kWh + 0.50€ fee
Comment by psubiaco 08/27/2024 07:47:46
Rating: 5 out of 5 [ General Comment , Charged Successfully ]Very good place to park to visit the castel. 2€/hour. Excellent fee: 0.22€/kWh + 0.50€ (transaction fee). Very good solution to avoid paying for funicular.
Comment by psubiaco 08/27/2024 07:45:36
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-elektro-ljubljana-22-kw-ljubljanski-grad-lubiana-lj-grajska-planota-1-t3635.html Comment by ForumElettrico.it 09/17/2018 15:44:22
Other Charging Locations
There are 9 matching results
GNE Streliška pri tunelu
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Elektro Ljubljana
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Petrol Poljanski nasip
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Petrol Streliška ulica 24
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Petrol Grudnovo nabrežje 7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Petrol Poljanski nasip 12
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GNE 5. klet Kongresni trg
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GNE 1. klet Kongresni trg
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GNE Parkirna hiša Rog
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by psubiaco on 2024-08-27
Uploaded by ForumElettrico.it on 2018-09-17
Uploaded by ForumElettrico.it on 2018-09-17
Uploaded by ForumElettrico.it on 2018-09-17
Uploaded by ForumElettrico.it on 2018-09-17