To edit, add comments or upload photos: Sign In
(My Pertamina) SPBU 31.453.01 Jatinangorcharging location
Nearest Address:
(My Pertamina) SPBU 31.453.01 Jatinangor,
Jl Raya Jatinangor
Kabupaten Sumedang
Jawa Barat
45363
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-6.931847975198949
Longitude:
107.775458834657
OCM Ref: OCM-510565
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-879552
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Universitas Padjajaran Jatinangor
1
Universitas Padjajaran Jatinangor,
Jl Raya Jatinangor
Kabupaten Sumedang
Jawa Barat
45363
Indonesia
View
0.77 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Jatinangor Golf & Resort
1.63 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Tanjungsari
3.31 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Summarecon Mall Bandung
5.53 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest Area KM 149 B Tol Purbaleunyi
5.58 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plaza Summarecon
5.85 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
BYD Arista Soekarno Hatta
6.84 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 147 A Tol Purbaleunyi
6.93 Miles
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 2)
Lasumi Car Wash & Coffee Shop
7.21 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In