To edit, add comments or upload photos: Sign In
Rest Area KM 397 B Tol Talang Betutue Palembangcharging location
Nearest Address:
Rest Area KM 397 B Tol Talang Betutue Palembang
Kabupaten Banyuasin
Sumatera Selatan
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh
Operational Status:
Not Operational
Latitude:
-2.901434000000407
Longitude:
104.561649999996
OCM Ref: OCM-500697
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-855283
30 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rest Area KM 397 A Tol Talang Betutue Palembang
Rest Rest Area KM 397 A Tol Talang Betutue Palembang
Kabupaten Banyuasin
Sumatera Selatan
Indonesia
View
0.15 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bandara SMB II Palembang
9.88 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Pangkalan Balai
10.92 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN S2JB Demang
12.55 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BYD Arista Palembang
12.77 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN KIT SBS
12.82 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Kantor Dinas ESDM
13.55 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
(Astra Otopower) Palembang Icon
(Astra Otopower) Palembang Icon,
Jl POM IX, Lorong Pakjo
Palembang
Sumatera Selatan
30121
Indonesia
View
13.73 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(ASTRA OTOPOWER) The Venus Golden Hall
(ASTRA OTOPOWER) The Venus Golden Hall,
Jl R Sukamto
Palembang
Sumatera Selatan
30164
Indonesia
View
13.92 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In