To edit, add comments or upload photos: Sign In

Odpočívadlo Sekule (smer Brno)charging location

Nearest Address:
Sekule 1
Sekule
908 80
Slovakia

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 1
Usage: Public
Operational Status: Operational
Latitude: 48.614582
Longitude: 17.013552
OCM Ref: OCM-103869
Network/Operator

Greenway http://www.plug-in.sk/ +421 911 668 770

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)

Data Quality Report


Data Quality Score: 70 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - No comments or check-ins
  •   User Feedback - No photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CHAdeMO

Level 3: High (Over 40kW))
Operational)
1 Present
OCM-CN-146631
50 kW DC

Add your own comment/check-in for this location:

Sign In

Points Of Interest

Other Charging Locations

There are 5 matching results

Sekule (D2)
 

D2 682
Sekule
908 80
Slovakia
View
0.01 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO

Motorest U Janíčkov
 

Kúty 198
Kúty
908 01
Slovakia
View
1.72 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO

Billa Břeclav
 

Třída 1. máje 3086/2
Břeclav
okres Břeclav
69002
Czech Republic
View
11.72 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Mennekes (Type 2)

LBS Zistersdorf
1  

Schlossplatz 7
Zistersdorf
Niederösterreich
2225
Austria
View
12.57 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin

Tesco Hm
 

Pezinská 35a
Malacky
901 01
Slovakia
View
12.65 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2 Version of Combined Coupler)

Upload your own photos for this location: Sign In